Skip to content

Steel fabrication

Second Static Grizzly at B3 — Fabrication and Installation

Fabrication, assembly and installation of a second static grizzly at the B3 crusher area to support oxide feed to the Kamoto mills.

Static grizzly fabrication yard — reference visual

Project overview

The documented method statement covers fabrication and installation of two static grizzlies at B3, from drawing review and steel cutting through assembly, staging and final installation.

Scope of work

  • Review drawings with the client
  • Cut structural-steel components to specification
  • Assemble and weld the static grizzly structures
  • Stage and install at the identified B3 location
  • Maintain daily housekeeping and controlled waste disposal

Delivery

The documented fabrication used structural steel, welding and cutting equipment, followed by on-site staging and installation in accordance with the agreed drawings and KCC recommendations.

Safety & environment

The method required daily permits, PPE, risk assessment, authorised personnel, safe material storage, protected openings and orderly work areas.

Discuss a similar project