Fencing & site security
Cobalt Dryer Fencing
Supply and installation of a welded-mesh security fence around the cobalt dryers area at KTC, including 106 steel posts of 3 m set in 1 m deep holes, welded mesh panels, bracing and site demarcation.








Project overview
In September 2020, GNS secured the cobalt dryers area at KTC with a complete welded-mesh fence. The team set 106 steel posts of 3 m in 1 m deep excavations, fixed the welded mesh panels with bracing, and demarcated the working area in line with KCC safety requirements.
Scope of work
- 106 steel posts of 3 m installed in 1 m deep holes
- Welded mesh panels fixed and braced
- Site demarcation and barricading
- Housekeeping and waste disposal to designated KCC dump
1 documented locations
Project gallery
Field images are organised by site for clear technical review.
Cobalt dryers area — KTC38 media items
Related projects

Kamoto Copper Company (KCC) · Kolwezi, Lualaba, DRC
Luilu Cobalt Chambers and Plinths Construction
Construction of reinforced concrete plinths (400 × 400 mm) and sewage chambers (6.3 × 3.7 × 2.35 m deep) for the container ablutions at Luilu's Cobalt Plant, with full plumbing and electrical connections (scope EP259-01).
View project
Kamoto Copper Company (KCC) · Kolwezi
Acid Plant new ablution chamber
Construction of new ablution chambers at the Acid Plant, documented from reinforcement and concrete placement through blockwork, plastering, cover slabs and completed modular facilities.
View project
Kamoa
Road dust suppression
Treatment of haul and access roads to reduce dust, improve visibility and protect people and equipment.
View project