Engineering & construction
Process and emergency pond works at Metalkol
Documented works across the Event, LG, HG and Emergency pond areas at Metalkol.



Project overview
GNS carried out documented pond works at Metalkol across the Event Pond, LG Pond, HG Pond and Emergency Pond areas.
Scope of work
- Event Pond works
- LG Pond works
- HG Pond works
- Emergency Pond works
Delivery
The photographic record documents staged works across prepared pond areas and installed lining surfaces.
Safety & environment
Personnel are shown using site protective equipment during the documented pond works.
1 documented locations
Project gallery
Field images are organised by site for clear technical review.
Other documented sites3 media items
Related services
Related projects

Kamoto Copper Company (KCC) · Kolwezi, Lualaba, DRC
Cobalt Dryer Fencing
Supply and installation of a welded-mesh security fence around the cobalt dryers area at KTC, including 106 steel posts of 3 m set in 1 m deep holes, welded mesh panels, bracing and site demarcation.
View project
Kamoto Copper Company (KCC) · Kolwezi, Lualaba, DRC
Luilu Cobalt Chambers and Plinths Construction
Construction of reinforced concrete plinths (400 × 400 mm) and sewage chambers (6.3 × 3.7 × 2.35 m deep) for the container ablutions at Luilu's Cobalt Plant, with full plumbing and electrical connections (scope EP259-01).
View project
Kamoto Copper Company (KCC) · Kolwezi
Acid Plant new ablution chamber
Construction of new ablution chambers at the Acid Plant, documented from reinforcement and concrete placement through blockwork, plastering, cover slabs and completed modular facilities.
View project