Laboratory refurbishment

Luilu Met Lab refurbishment

Refurbishment of the Luilu metallurgical laboratory, covering a 37 m concrete laboratory cabinet, granite worktops, acid-proof finishes, two laboratory sinks, wall and ceiling finishes.

Refurbished laboratory cabinets and granite worktops at Luilu Met Lab

Project overview

KCC commissioned services and construction works to bring the Luilu metallurgical laboratory to the required standard. The documented scope combined demolition, purpose-built laboratory furniture, finishes and plumbing.

Scope of work

  • Demolition and disposal of existing laboratory cabinets
  • 37 m concrete laboratory cabinet in 25 MPa concrete
  • Granite worktops and lockable varnished wooden doors
  • Acid-proof tiled shelves and plinths
  • Plastering and painting of 430 m² of walls
  • Painting of 120 m² of ceiling
  • Two acid-proof laboratory sinks with piping and mixers
  • Daily housekeeping and controlled scrap disposal

Delivery

GNS was tasked with demolishing and disposing of the existing cabinets, then constructing 37 m of 900 mm-high and 800 mm-wide concrete laboratory cabinetry in 25 MPa concrete. Separating shelves were planned every 1.2 m, with two shelves, granite worktops, lockable varnished wooden doors, acid-proof tiled internal shelves and 100 × 80 mm tiled plinths. The works also covered plastering and painting 430 m² of walls, painting 120 m² of ceiling, and supplying and installing two acid-proof laboratory sinks with piping and mixers.

Safety & environment

KCC provided plant access and the required safety induction. GNS obligations included qualified personnel, PPE, maintained equipment, risk assessments and method statements, daily safety talks, permits, medical and insurance provisions, daily housekeeping, and disposal of scrap in the designated bins.