Manufacture and installation of 260 m of safety fencing, 63 steel supports and one 10 × 2 m double sliding gate around the Luilu leaching tanks.








Project overview
KCC commissioned GNS to fence the Luilu leaching tanks area and regulate access where exposure to gas without the required PPE is detrimental to health. The documented services and construction period ran from 15 August to 30 October 2020.
Scope of work
- 260 m of fencing, approximately 2.4 m high
- 63 steel-pipe supports, 3 m long, spaced 3 m apart
- One 10 × 2 m double sliding gate
- Concrete fixing of supports in 1 m holes
- Daily housekeeping and scrap removal
Delivery
GNS supplied the fabrication materials, plant, tools and qualified labour. The scope included two 3.5 m gate supports in 6-inch pipe, a rectangular-tube gate frame, square-tube mesh framing, drilling and concrete fixing, welding the fence to steel supports and leaching structures, painting, and use of a backhoe for the support holes.
Safety & environment
The enclosure was required to control access because gas exposure without appropriate PPE is harmful. KCC provided plant access, safety induction, a crane and the fence material; GNS provided qualified personnel, PPE, risk assessments, method statements, daily safety talks and housekeeping.
1 documented locations
Project gallery
Field images are organised by site for clear technical review.
Luilu Leaching TanksSafety perimeter documented through 33 distinct photographs.33 media items
Related services
Related projects

Kamoto Copper Company (KCC) · Kolwezi, Lualaba, DRC
Cobalt Dryer Fencing
Supply and installation of a welded-mesh security fence around the cobalt dryers area at KTC, including 106 steel posts of 3 m set in 1 m deep holes, welded mesh panels, bracing and site demarcation.
View project
Kamoto Copper Company (KCC) · Kolwezi, Lualaba, DRC
Luilu Cobalt Chambers and Plinths Construction
Construction of reinforced concrete plinths (400 × 400 mm) and sewage chambers (6.3 × 3.7 × 2.35 m deep) for the container ablutions at Luilu's Cobalt Plant, with full plumbing and electrical connections (scope EP259-01).
View project
Kamoto Copper Company (KCC) · Kolwezi
Acid Plant new ablution chamber
Construction of new ablution chambers at the Acid Plant, documented from reinforcement and concrete placement through blockwork, plastering, cover slabs and completed modular facilities.
View project