Skip to content

Civil construction

KOV IPC Container Ablution Civil Works

Construction of reinforced-concrete plinths and a sewage chamber, with plumbing and electrical connections for new container ablutions in the KOV IPC area.

Container ablution civil works at KOV IPC

Project overview

The documented KCC scope, reference EP246-01, covers the civil infrastructure required for employee ablutions at KOV IPC: four reinforced-concrete plinths, a sewage chamber, a water-tank slab and the connections needed to commission the facility.

Scope of work

  • Four 400 × 400 mm reinforced-concrete container supports
  • 6.3 × 3.7 m sewage chamber, 2.35 m deep
  • 3 × 3 m reinforced-concrete slab for the water tank
  • 10,000-litre water tank, pump and protected control panel
  • Water-supply and wastewater connections

Delivery

The works covered site establishment, excavation and compaction, reinforced-concrete slabs and columns, concrete-block walls, waterproofing, inspection covers, backfilling, plumbing, pump controls and compliance testing.

Safety & environment

The documented requirements included hard barricades, PPE, risk assessments, daily safety talks, controlled material storage and continuous housekeeping.

Discuss a similar project