Luilu Lime Plant Maintenance Office Fibre Link

Installation of a new fibre link from the Luilu dispatch plant to the maintenance office behind the lime plant.

Fibre-link team and site documentation

Project overview

KCC commissioned a network extension for the new maintenance office behind the Luilu Lime Plant. The documented service period ran from 10 August to 10 September 2020.

Scope of work

  • 500 m of new fibre link
  • Route from Luilu Dispatch to the rear Lime Plant maintenance office
  • 50 m of trenching
  • Aerial routing on cable trays
  • Use of a cherry picker where required

Delivery

KCC provided safety induction, fibre and accessories. GNS installed the link to KCC requirements using aerial cable trays and the documented trench section.

Safety & environment

Work was planned for seven hours per day with site induction and access controls, including elevated access by cherry picker.