Southern Zone solar-kit maintenance and installation

Maintenance and installation of solar-kit equipment across Rawbank sites in the Southern Zone.

Rooftop solar panels documented during the Rawbank Southern Zone assignment

Project overview

GNS carried out solar-kit maintenance and installation work for Rawbank in the Southern Zone. The documented assignment covered rooftop solar equipment and associated indoor power components.

Scope of work

  • Rooftop solar-panel work
  • Installation and maintenance of power-control components
  • Chemaf Kalukulu — No solar panels, one battery requires replacement, cleaning is required and the humidity level is high.
  • Top Market — Additional solar panels and cleaning are required; the batteries are in very good condition.
  • Résidence Le Battant — The installation is in good condition; clean, test and wipe the equipment.
  • Luano — Equipment is in good condition; measurements were taken and cleaning was completed.
  • DRH Kat — The installation must be redone; panels must be replaced and relocated. The equipment was inspected and cleaned.
  • La Scala — One panel is broken and the other three are short-circuited. The panels must be replaced. A shading issue was identified; the installation was inspected and cleaned.
  • Mwangeji GPM — Difficulty with the incoming connection from the generator; corrective work is in progress.
  • Cité Maman Mujinga — Equipment inspected and cleaned. No solar panels. The site uses a Victron 48 V / 3000 VA / 35 A inverter.
  • Connexas — equipment inspected and cleaned.
  • Kamoto — equipment inspected and cleaned.
  • Frontier Sakania — equipment inspected and cleaned.
  • Kakanda — nine 400 W solar panels.

Delivery

Works were carried out at the documented sites using the installed solar arrays and associated power equipment as the work environment.