Industrial services
Southern Zone solar-kit maintenance and installation
Maintenance and installation of solar-kit equipment across Rawbank sites in the Southern Zone.








Project overview
GNS carried out solar-kit maintenance and installation work for Rawbank in the Southern Zone. The documented assignment covered rooftop solar equipment and associated indoor power components.
Scope of work
- Rooftop solar-panel work
- Installation and maintenance of power-control components
- Chemaf Kalukulu — No solar panels, one battery requires replacement, cleaning is required and the humidity level is high.
- Top Market — Additional solar panels and cleaning are required; the batteries are in very good condition.
- Résidence Le Battant — The installation is in good condition; clean, test and wipe the equipment.
- Luano — Equipment is in good condition; measurements were taken and cleaning was completed.
- DRH Kat — The installation must be redone; panels must be replaced and relocated. The equipment was inspected and cleaned.
- La Scala — One panel is broken and the other three are short-circuited. The panels must be replaced. A shading issue was identified; the installation was inspected and cleaned.
- Mwangeji GPM — Difficulty with the incoming connection from the generator; corrective work is in progress.
- Cité Maman Mujinga — Equipment inspected and cleaned. No solar panels. The site uses a Victron 48 V / 3000 VA / 35 A inverter.
- Connexas — equipment inspected and cleaned.
- Kamoto — equipment inspected and cleaned.
- Frontier Sakania — equipment inspected and cleaned.
- Kakanda — nine 400 W solar panels.
Delivery
Works were carried out at the documented sites using the installed solar arrays and associated power equipment as the work environment.
12 documented locations
Project gallery
Field images are organised by site for clear technical review.
Other documented sites4 media items
Chemaf KalukuluNo panel; battery replacement required; cleaning required; high humidity level.2 media items
Top MarketPanels need to be added; cleaning required; batteries in very good condition.3 media items
Le Battant ResidenceInstallation inspected and documented.1 media item
DRH KatInstallation must be redone; panels must be replaced and relocated; equipment inspected and cleaned.3 media items
La ScalaOne broken panel and three others short-circuited; panels must be replaced; shading issue; installation inspected and cleaned.1 media item
Mwangeji GPMDifficulty with the SNEL–generator supply; treatment in progress.1 media item
Cité Maman MujingaEquipment inspected and cleaned. No solar panels. Victron converter 48 V / 3000 VA / 35 A.5 media items
ConnexasEquipment inspected and cleaned.1 media item
KamotoEquipment inspected and cleaned.3 media items
Frontier SakaniaEquipment inspected and cleaned.2 media items
KakandaNine 400 W panels; equipment inspected and cleaned.6 media items
Related projects

Dathcom Mining SA · Manono, Tanganyika
Electrical Equipment Supply for AVZ Manono Project
Delivery documented on 25 October 2022 under PO 3000100.
View project
Tenke Fungurume Mining (TFM) · Lualaba, DRC
Combustion-chamber brick lining and acid-proofing
Historical brick-lining and acid-proofing works at the Kwatebala Plant.
View project
Kamoto Copper Company (KCC) · KCC industrial sites
Dryers and Roaster Refractories Maintenance
KCC documented scope for refractory masonry maintenance at the roasters and cobalt dryers.
View project